Camp Sweyolakan Water Facility Plan and Upgrade
Camp Sweyolakan Water Facility Plan and Upgrade
The purpose of this project is to create a water facility plan detailing the deficiencies of the Camp Sweyolakan drinking water system, create a program of upgrades, and design several of the updates in detail. Camp Sweyolakan is a children’s summer camp on Lake Coeur d’Alene. The camp drinking water system was built in 1922 and faces many age-related issues. Additional design challenges include planning for an expansion of camp capacity and increasing the operating season of the camp.
Attend Our Technical Presentation
3:50 p.m. Thursday, April 28 – Session 2
Team Members
Willow Crites - Civil Engineering
Criss Ward - Civil Engineering
Brian Peck - Civil Engineering
Benjamin McMurtry - Civil Engineering
Client/Sponsor
T-O Engineers
Faculty Advisor
Richard Nielsen - U of I Department of Civil and Environmental Engineering
Meet Us at EXPO April 29
Booth Number: 04
Join us in-person 9 a.m.-12 p.m. April 29 in the Idaho Central Credit Union Arena on the Moscow campus during our annual Engineering Design EXPO! Browse all student team booths. Maps are available on-site.